Abuja-Kaduna train Grounded, See Details

0
Abuja-Kaduna Train
Advertisement

Diesel Shortage Grounds Service

Nigerians have received an apology from the Nigerian Railway Corporation, NRC.

The NRC expressed regret for the Monday train delay between Abuja and Kaduna.

Advertisement

Read Also: Tinubu Not Enjoying Enough Support From Buhari As Expected — APC Chieftain 

After receiving complaints from passengers, Pascal Nnorli, Manager of the Abuja-Kaduna Train Service (AKTS), released a statement.

The delay, according to Nnorli, was brought on by a shortage of diesel.

He claimed that the AGO received fell short of the required standard and was categorically rejected following a required laboratory test.

Advertisement

The manager explained that the test is done on every liquid used on the rolling stock, including locomotives, to make sure the proper specifications are being used.

Also Read: Naja’atu Sacked For Incompetence, A Mole —APC Fires Back At Director Who Resigned To Join Atiku

According to the statement, operations would return to normal because management had control of the situation.

On December 5, 2022, the train service between Abuja and Kaduna was restored after a hiatus of more than eight months caused by a terrorist attack.

On March 28, 2022, at Katari in Kaduna State, at least 63 people were kidnapped and approximately 14 people were killed. After the release of 7 prisoners in July, the final group of 23 prisoners was set free in October.

 

Advertisement

Thanks for using our platform to learn about the latest on Diesel Shortage Grounds Service

Advertisement

LEAVE A REPLY

Please enter your comment!
Please enter your name here